Austin Energy · Congestion Costs

  • One mark per settlement point per interval, at its price, sized by its megawatts.
  • Shaded band is the basis — red the fleet is paid less than Austin Energy pays at LZ_AEN, green more.
  • Marks cluster when the grid is clear and spread when it congests.
  • Hover for the interval's plants; click to pin.

Cumulative basis cost through the year

Hover for a running total.

  • Running total from 1 January, one line per year; the slope is the rate at which basis is costing Austin Energy.
  • Cost is generation MWh times the shortfall against LZ_AEN, so a steep stretch means a wide basis, a lot of output, or both.
  • Dashed lines are part years.

How long a bad basis lasts

Hover a segment.

  • Every stretch where the fleet was paid below LZ_AEN, bucketed by how long it ran and stacked by the worst it got. Covers all $828.6M of adverse basis; the $0–10 band alone is $174.0M across half of all intervals.
  • Height is cost — generation MWh times the shortfall, summed over the episode — not how often it happened. Episode counts are shown under each total.
  • Each episode is counted once, in the band of its worst interval.